Мени

Prijavi problem

Bridge in Mralino will be build

Published on: 11.09.2016 - 14:34

Within the project "Construction and rehabilitation of 10 bridges",the construction of the entrance to Mralino, street "1", is ongoing: construction of reinforced concrete plate bridge with a length of 8 meters and a width of also 8 meters . Road will be 6 meters wide, and on both sides of the road will be constructed sidewalks width of one meter.
The total investment for this project is 4 million, provided by the Budget of the Municipality of Ilinden.
The new bridge being built in place of the old ruined and dilapidated passage that hindered the normal flow of rainwater from the floating channel and an obstacle for normal traffic.
The construction of the bridge despite the safety of road users, enabling a seamless flow of storm water, which will reduce the possibility of occurrence of floods and provide clean environment which is one of the requirements for quality of life of the population.

Post new comment

The content of this field is kept private and will not be shown publicly.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
  • You may use [swf file="song.mp3"] to display Flash files inline

More information about formatting options

Image CAPTCHA
Enter the characters shown in the image.

Find Us On...

Find Општина Илинден on TwitterFind Општина Илинден on FacebookFind Општина Илинден on YouTube

пребарување

Видео

ИНВЕСТИЦИСКИТЕ ПАТИШТА ВОДАТ КОН ОПШТИНА ИЛИНДЕН
ilinden.gov.mk © 2013